1. Which form of agreement is executed for Lumsum contract

C

4 choice options

2. Which symbol is used for weakly paid holiday of daily wages labour

WPH

4 choice options

3. What is the initial record upon which the account of works are based ( anyone)

MB

4 choice options

4. Which is the competent authority the appoint divisional accountant

AG

4 choice options

5. Which class of B1 tender is operated for withdrawal of work from the contractor

3

4 choice options

6. In which form the survey report is prepared and submitted to the Division Office

32

4 choice options

7. Which form of agreement is used for supply of material

D

4 choice options

8. Who will help the secretary in exercising effective control over Maintenance of Govt accounts

IFA

4 choice options

9. When the fool and free consent of the public is to be obtained in destruction of structure

Religious edifices

4 choice options

10. Who will accept the draft tender papers for the works costing more than 60 lakh to 1 crore

SE

4 choice options

11. What powers are deligated to EE for sanctioning the extra Item rate list

100000

4 choice options

12. Which is the item rate contract

B2

4 choice options

13. What is the authorised from for preparation of contractors bill of first and final

46

4 choice options

14. Which form is used for making the payment on hand receipt

48

4 choice options

15. Where the expenditure of maintenance and repairs of road and bridges are to be debited

3054

4 choice options

16. What is the authorised form of running A/C bill of the contractor

47

4 choice options

17. Where the receipt of sale of Tender form (B lands ) are to be credited in WRD

0701

4 choice options

18. Which form is used for exclusion of agreement regarding the conveyance of material

E

4 choice options

19. Where the expenditure incurred on M&R to administrative building are to be classified

2059

4 choice options

20. Which part shortage awaiting adjustments are recorded in T & P Ledger

3

4 choice options

21. Which authority is entitted to conduct Load testing of Bridges

MERI

4 choice options

22. Where the expenditure incurred on M & R residential building are debited

2216

4 choice options

23. What powers are deligated to the Executive Engineer to sanction the imprest to the Jr. Engineer

1000

4 choice options

24. How much CADA authorities are created of the govt. under the irrigation Department

5

4 choice options

25. Where the expenditure incurred on M&R to Major dams are to be debited

2701

4 choice options

26. Where the scale of fruits of the trees located in the premises of section office is classified

0701

4 choice options

27. Which contract form is used for supply of store material

D

4 choice options

28. Which form the service record in maintained of daily wages labour

Service Roll

4 choice options

29. Which clause of B1 tender is operated to issue notice to the contractor for slow progress of work

2

4 choice options

30. Which form is used for issue of material to the contractor as per schedule A of the contract

USR

4 choice options

31. Which section is applied for issuing final declaration of private land for the govt. purpose

Section 6

4 choice options

32. What power are Deligated to accept the tender of civil work to the chief Engineer

15 Cr.

4 choice options

33. What are the powers delegated to the Executive Engineer for departmental excution of work

5 Lakh

4 choice options

34. What are the powers for recording the measurement to the store keeper for petty purchases without checking

4000

4 choice options

35. How much SuperVision charges are lavied when the material are sold the local bodies

10 %

4 choice options

36. Classes of transaction which do not pass through the cash or stock account. 1) for credit to purchases on account of materials received for work from sources other than stock. 2) for credit to PW deposits on account of balances due to contractor on close account

Both 1 and 2

4 choice options

37. Bin card keeps record of following related to stock 1) receipt and issue of stock 2) running balance of each article of stock 3) claims for stock received from other Public Work division 4) quantity record of stock transaction

1,2 and 4

4 choice options

38. Initial accounts and vouchers connected with charges related to work must in variable specify 1) form No. 20 (P.W. 504) filled with all charges of tendency from the sub-ordinates in charges of the properties. 2) the name of component part (or sab head) or it, is separate accounts are kept. 3) the name of work (as given in estimate) 4) the charges (if any) which are of nature of recoverable payments & names of contractor from whom recoverable

2,3 & 4

4 choice options

39. Sub divisional officer should always Sign the bill after 1) comparing quantities in bill with those recorded in MB 2) checking all the rates are correctly entered. 3) all calculation shall be correct is confirmed with Scrutiny. 4 ) when the bill is on running account it should be compared with previous bill

All correct

4 choice options

40. The account of each subhead in work abstract does not exhibit

None of the above

4 choice options

41. A collective record of Expenditure & liabilities incurred in a sub division during a Year should be kept in sub divisional office in form No.

58 and 59 ( PW 650 and PW 651)

4 choice options

42. Transaction of following classes passed through Public Work deposit head 1) deposit for work other than talcavi works to be done 2) some due to contractor on closed account 3) miscellaneous Deposits 4) cash Deposits of sub-ordinates

1,2,3, 4

4 choice options

43. Following documents are supported While submitting account to the accountant general 1) form No. 100 102 104 105 2) Form No. 28 32 33 34 3) Form No. 70 73 76 77 78 4 ) Form No. 88 91 92 93 94 5 ) Form No. 95 96 97 98 99

All the Above

4 choice options

44. In records of the transaction and cash book following statements are correct 1) there is no limit of transaction in a cash book in a year 2) transaction must be entered in cash book as soon as they Occur 3) full amount of Grand Shalby utilised by drawing check and depositing them in office cash chest 4) keeping cash book open after 31st March and make disbursement in April entering them in cash book as having been made in March

1,2

4 choice options

45. Transfer entry order needs following 1) particular of transaction with the reason for purpose adjustment 2) debits or credit with name of work or head of account 3) dated signature of Divisional accountant and officer 4) number and date of authority ordering recovery

1,2,3

4 choice options

46. Form number 26 Bin card have columns 1) reference to statement of stock receipts / indents for Store 2) name of sub divisional officer sub ordinate to whom issued 3) signature of officer to whom issued 4) date of Return of completed card to divisional sub divisional officer

Only 1

4 choice options

47. In form No. 45 (PW 9) measurement book L is length B is breath and D is the depth which of the following measurements cannot be measured and recorded 1) quantity of sphere 2) quantity of cylindrical solid column 3) quantity of piers having cut water and easy water semi circular 4) quantity of carpet and Seal Coat for road curved in longitudinal section

None of Above

4 choice options

48. Pick up the incorrect statement 1) measurement always recorded on the spot at site and not in office or elsewhere 2) date of work finish and date of measurement shall always be same 3) in MB last measurement with page number and quantity shall be specified 4) name of work and agency Shall be specified

Only 2

4 choice options

49. Measurement book can be recorded by 1) civil engineer assistant if authority given by EE for miscellaneous types recording treated as executive sub ordinate 2) junior engineer sectional engineer assistant engineer 3) deputy engineer assistant engineer -1 assistant executive engineer 4) Executive Engineer 5) superintending engineer chief engineer

1,2,3,4

4 choice options

50. Schedule docket Includes 1) name of contractor agency 2) number of voucher 3) Amount 4) Name of work

2,3,4

4 choice options

51. The correct statement 1) before finalizing the agreement the royalty clearance certificate shall be brought by agency contractor 2) deduct royalty of sand as much quantity taken in the estimate 3) deduct royalty of sand by the by rate taken in the estimate 4) royalty of sand will be on quantity of actual work done and the red shall be taken which are updated by the government time to time

1 and 4

4 choice options

52. Pick up the incorrect statements regarding Schedule of Rates 1)lowest rates in accepted tenders which are clay clearly found on work available and erectic shall be left out of conting consideration 2) complete analysis of rate for particular item of work shall be made in all cases in which cost of item is more than 50000 3) Provision of minimum wages act shall be taken into consideration while preparing schedule 4) loading and unloading operation shall be included in schedule of rate where ever necessary

2

4 choice options

53. Estimates for maintenance of and repairs to work to be executed during year preparation( in a previous financial year) sanction by EE sanction invariable communicated to audit office respectively before dates

15 January 15 April 15 May

4 choice options

54. System of Green Card ok card shall also be followed where height of embankment is more than.......... M and for Canal structure costing more than........... Crores.

3,1

4 choice options

55. When the lowest tender before the final stage of acceptance becomes invalid for any reason like non completions obtained document in time then pick up correct statement 1) this lowest tender is atomically rejected 2) lowest tender earnest money returned 3) second lowest tender become lowest and considered for acceptance 4) approval of committee shall be taken for finalizing the second lowest standard to be accepted

1 And 3

4 choice options

56. Recording allotment of work to 1) labour cooperative society 2) piece worker 3) B1 contract 4) carry out work departmentally by taking permission of superintending engineer starting with most preferable pick up the correct sequence

3,1,2,4

4 choice options

57. In general acceptance of tender should not take more than..... days....... days after opening tenders in case of tender Finally delt with at level of EE, SE and CE respectively

30,60,90

4 choice options

58. Alteration in design material during construction can be done by following rules made under section of mpw manual

263, 264, 265, 266, 267 and para 134

4 choice options

59. Unless emergency or urgency works verbal orders from EE for commencement of work shall be

Not accepted as acceptance of order lead to misapprehension

4 choice options

60. On ground of emergency Executive Engineer is required to carry out work for which number estimate has been sanctioned nor financial provision exists

EE Can execute the work by taking site visit of higher authorities if needed and spending possible expand teacher cost to audit has well as principal auditor

4 choice options

61. Charged expenditure means

The expenditure not subject to vote of Legislature which pertain on consolidated fund

4 choice options

62. Intermediate payment includes 1) advance payment 2) secured advance 3) an on account payment 4) last payment on running account

1,2,3

4 choice options

63. The Divisional accountant is responsible for 1) arrangements for checking the computed tenders and notice all instance in which sub Ordinance officer exceeds financial limits. 2) restricting tender cost 3 ) A test check of the computed and checked Tenders 4) comparative statements correctly incorporating the total

1,3 & 4

4 choice options

64. The results of audit are communicated to the Divisional officer in the form of 1) audit notes 2) inspection reports 3) letters 4) memoranda

1,2,3, & 4

4 choice options

65. All liabilities and acids of the division adjustable by transfer credit or debit to remittance head of account should be recorded in

Register of transfer awaited

4 choice options

66. The terms involved in cash book are 1) verification 2) balancing 3) Rectification of errors. 4) up keeping cashbooks

All of the Above

4 choice options

67. Select correct statements of the following 1) an issue hate is assigned to each new article as it is brought on stock 2) the issue rate is fixed on the principle that the cost to be charged to works

Both 1 & 2 correct

4 choice options

68. Pick up the incorrect statement

Form number 48 (PW 409) and receipts for the very first bill to be paid to the contractor of the one contract

4 choice options

69. Examination of bills by sub divisional officer 1) entries in MB relating to description 2)entries in MB relating to quantities of work 3) calculation of context or area column

1, 2, 3

4 choice options

70. Full rates as per agreement (schedule B) allowed only if

Quantity of work done is up to stipulated specification

4 choice options

71. When work done by contractor fall sort of stipulated standard then 1) it is not necessary to insist on doing part rate in intermediate bills 2) if reduce rate proposed in Final bill rate analysis shall be got approved by Executive engineer

Both are incorrect

4 choice options

72. Date of completion of work is the day on which final measurements are recorded by engineer in charge 2) the date on which work finished

Only 2

4 choice options

73. The Final bill should be paid within maximum Period of.......of the expiry of contract period

5 Months

4 choice options

74. Refund of security deposit will be.......... from expiry of contract period or expiry of maintenance period Whichever later

6 Months

4 choice options

75. When tools and plants are transferred to other division, departments, the sub divisional officer should note in the form 34 in

Red ink

4 choice options

76. What is the preservation period legal affairs Suits

50 Years

4 choice options

77. How much period is required for converting the daily wages labour on CRT establishment

5 years

4 choice options

78. The field level are taken in which books

Field Book

4 choice options

79. Which form is used for recording the measurements of stock material

22

4 choice options

80. Which is the item rate contract

B2

4 choice options

81. Which rate is adopted for execution of extra item

CSR

4 choice options

82. Who will prepare the plans of the monumental buildings and structure

Architect

4 choice options

83. Which year the engineering Staff College presently engineering training academy established

1964

4 choice options

84. What is the preservation period of Register of interest bearing securities

Permentent

4 choice options

85. What is the financial Eligibility of class 3 contractor for tendering the work

300 Lakhs

4 choice options

86. Which is the document used for interest bearing security

FDR

4 choice options

87. Which clause of B1 tender is operated for the excess quantity executed by the contractor for revised rate

38

4 choice options

88. What is the financial Eligibility of class 6 contractor for tendering the work

15 Lakhs

4 choice options

89. Which unit is operated for measuring the work of dewatering during execution

BHP

4 choice options

90. How much members are in the public account committee

19

4 choice options

91. What is the financial Eligibility of class 7 contractor for tendering the work

10 Lakhs

4 choice options

92. Where the emoluments and allowances of Governor are to be classified

Charged exp.

4 choice options

93. Which head of account the EGS expenditure is to be debited

2505

4 choice options

94. What is the age limit for employment of labour on department work

14

4 choice options

95. Which agency is tackled engineering research problem

MERI

4 choice options

96. Clause 227 To 232 of MPW manual related to

Extra item

4 choice options

97. All important structure like dams, Barrages of national importance shall have express feeder generator clause 157 of mpw manual also need lighting conductor is Shall be periodically inspected and tested by

EE, Electrical

4 choice options

98. Quantity of water allotted to each channel and the area irrigable there form in tabular form the dimensions of channel kept in form

155 A

4 choice options

99. With the help of following clause of mpw manual superintending engineer May authorized periodical repair of in anticipation of formal sanction to estimate in case of urgency

Clause 180

4 choice options

100. Which one of the following mpw manual clause will help us to carry out work in emergency such as danger of breach in main Canal etc (no need to call tender's publically )

Clause 191 (E)

4 choice options