1. Field tests carried out on concrete structure without any destruction to it are called
NDTS
4 choice options
2. What are the size of course aggregate in 40 MSA concrete
40 + 20 + 10 mm
4 choice options
3. What is the compressive strength of 43 grade BCC cement at 28 days
430 kg / cm. Sq.
4 choice options
4. Bricks are burnt at temperature form
700 Degree To 1000 Degree
4 choice options
5. The liquid limit and plastic limit exist in
Clay Soil
4 choice options
6. For ordinary Portland cement initial and final setting time are........... minutes &........ minutes respectively
30 & 600
4 choice options
7. 1 cm distance measured on map represent 10m on ground so the scale of map is
1 : 1000
4 choice options
8. In cement concrete mix the inert material is
Aggregate
4 choice options
9. In Hilly Region, Widening of road on curve is required to be done on........ site
Inner
4 choice options
10. Bearing capacity of soil is obtained by
Plate bering test
4 choice options
11. Cement older buy about 3 months losses its strength by
20%
4 choice options
12. Age of cement is obtained from the mark on cement bag it is in the format of
WW / MM / YY
4 choice options
13. Grade of HYSD bars in RCC is as per I.S. 1139
Fe - 415
4 choice options
14. The rising of water effect due to obstruction in waterway is
Afflux
4 choice options
15. In water intake test water loss is measured is unit
Lugeon
4 choice options
16. Material used as damp proofing course in Masonry walls is
Mastic Asphalt
4 choice options
17. In Darcy 's Formula for laminar flow Q=Kxix A where i is
Hydraulic gradient
4 choice options
18. If Canal is flowing below nalla bed what structure is recommended for Nalla flow
Super passage
4 choice options
19. Load of a standing truck on road bridge slab is......... load for that moment
Live load
4 choice options
20. The final rates adopted for preparation of an estimate are from
Rate Analysis
4 choice options
21. Beaching section is provided in earth Dam for
Avoid overtopping
4 choice options
22. Sismopactors or vibrating roller are used now for construction of
RCC Dam
4 choice options
23. 100% rainforcement of a slab is required to be checked by
D.E. of other Sub- Division
4 choice options
24. What is the range of size defined for fine aggregate in construction
4.75 To 0.075 mm
4 choice options
25. Unit for fineness modulus of sand are
Unitless
4 choice options
26. Send used for testing of cement in quality control lab or MERI lab is called
Standard sand
4 choice options
27. Void ratio is the ratio of volume of
Voids / Soilds
4 choice options
28. Soil which can do not be rolled to a thread at any water Content are........ soil
Non plastic
4 choice options
29. M20 concrete mix indicate the compressive strength of concrete as
20 N / MM. Sq
4 choice options
30. The process of bulking of sand occurs because of
Moisture in sand
4 choice options
31. Approximate density of reinforced cement concrete shall be about.......... kg. /m.cube
2400
4 choice options
32. In manning's Formula V = l/n. R 2/3 s 1/2 the P is
Wetted perimeter
4 choice options
33. Total quantity of A.C sheets required for covering 200 sq. M area is........ sq. m
230
4 choice options
34. Quantity of cement required for 1 cubic metre concrete of 1:2:4 proportion is
315 kg
4 choice options
35. Measurement of reinforcement Steel bars for payment to the contractor are on the basis of
Weight of bar
4 choice options
36. In Colgrout masonry the water cement ratio of Colgrout (1:3) is about
0.84
4 choice options
37. Overlap length for reinforcement bars of bar diameter 'D' in RCC is kept as
40 d
4 choice options
38. Identification marks in the bricks provided to form a key for holding the mortor is called
Frog
4 choice options
39. No. of bricks required for second class B.B Masonry of size 20 × 10 × 10 cm in C.M (1:4)
475
4 choice options
40. Workability of concrete is improved without increasing W/C ratio by adding
Plasticisers
4 choice options
41. Instrument used for measuring Area on map of known scale is
Planimeter
4 choice options
42. Water pressure from the Earth retained by a wing wall is released through
Weep Holes
4 choice options
43. Compressive strength of concrete is tested on concrete cube of size
15 × 15 × 15 cm
4 choice options
44. The lines joining the rain gauge stations showing equal amount of rainfall are called
Isohyets
4 choice options
45. In a load test of slab, the final load applied is....... times the design load
1.25
4 choice options
46. Discharge through Canal in F.P.S system is cubic feet for second indicate as
Cusecs
4 choice options
47. Material used in hurting and C.O.T of earth dam is
Imperiours
4 choice options
48. The area from which a dam Reservoir receive water for storage is called
Catchment area
4 choice options
49. Cylindrical core of Rock sample for testing compressive strength is having L/D ratio
2.0
4 choice options
50. The loss of water due to evapotranspiration of a reference crop is
Eto
4 choice options
51. The total area that can be irrigated by 1 cubic foot per second in a day is
Ai / DC
4 choice options
52. When with a Canal the area of only one side of the canal be irrigated it is called
Contour canol
4 choice options
53. Design Span or effective span of a RCC beam is always.......... clear span
Greater than
4 choice options
54. The diameter of the test test cylinder sample of Colgroute Masonry dam is
90 cm
4 choice options
55. The soil sample collected with a instrument Augar is........ sample
Disturbed
4 choice options
56. A water content below which a reduction in water will not cause decrease in volume of soil mass is
Shrinkage limit
4 choice options
57. Water cement ratio and strength of concrete relationship was established by
Duff Abram
4 choice options
58. System of submission of B1 tender is
Three envelop
4 choice options
59. Material used for reservation of timber by painting is major
White lead
4 choice options
60. Total number of major river basins in Maharashtra are
5
4 choice options
61. The latest land acquisition act is
LARR 2013
4 choice options
62. The curve composed of two Arch of different radius in opposite direction on road is
Riverse Curve
4 choice options
63. At 28 days curing, concrete attains a strength of
90 to 95 %
4 choice options
64. Slum contest is carried out to determine......... of concrete mix
Workability
4 choice options
65. As per IS- 456 -2000 the minimum grade of concrete for RCC should be
M-20
4 choice options
66. During the process of hardening of concrete......... take place
Hydration
4 choice options
67. Water used for concrete mixing & curing as per I.S specification shall be
Potable
4 choice options
68. Slip circle analysis for a earth dam is required to be done for a condition o
Sudden Drawdown
4 choice options
69. Thickness of road payment may reduce consideraly because of
All of these
4 choice options
70. Ultimate bering capacity of soil is the......... load at which
Soil fails
4 choice options
71. Send available for construction in Maharashtra is mainly from
River Bed
4 choice options
72. The liquid and plastic limits predominantly exist in..
Clay Soils
4 choice options
73. The vertical distance between the wall plate and top of the Ridges called...... of Roof
Rise
4 choice options
74. Steel in RCC beam takes......
Tension
4 choice options
75. The morter of the masonry joints to be covered by painting is raked out at least to a depth of......
20 mm
4 choice options
76. Ashikshan with more Steel reinforcement than balanced section is called......
Over Reinforced
4 choice options
77. Distemper is used on
Plastered surfaces not exposed to weather
4 choice options
78. The shrinkage in a concrete slab
Causes tension cracks
4 choice options
79. Safe permissible load for brick Masonry in cement mortar first class
88 ton / M.Sq.
4 choice options
80. The slump test of concrete is used to measure its
Consistency
4 choice options
81. The full form of M.D.D.L
Minimum draw down level
4 choice options
82. The unit weight for cubic metre of mild steel
7850 kg / m.cube
4 choice options
83. The vertical members to which shutter are attached are called as
All of these
4 choice options
84. The horizontal members at the top of the frame is called as
Head
4 choice options
85. Which of the following roofs are sloping roofs ?
All of the above
4 choice options
86. The purpose of the linseed oil is
For paints of common material
4 choice options
87. Minimum Compressive strength of hollow load bearing block should be
4.5 / MM sq
4 choice options
88. The full form of OMC
Optimum moisture content
4 choice options
89. Concrete consists of
All of the Above
4 choice options
90. RMC is short form of
Ready mix concrete
4 choice options
91. Platform at the end of series of steps is known as
Landing
4 choice options
92. Base course of lean concrete below spread footing is the proportion
1:4:8
4 choice options
93. Form work of props to Beams and Arches spanning over 6 m can be removed after
21 Days
4 choice options
94. Lift becomes essential in a building when the number of floors exceed
3
4 choice options
95. Movable barrier or shutter component is
All of this
4 choice options
96. Full form of S.W.F
Standing wave flume
4 choice options
97. The Unit Weight per cubic metre of water
1000 kg / m. Cube
4 choice options
98. If the soil is water logged its bearing capacity may be improved by
Drainage
4 choice options
99. If footing supports more than two columns it is called
Continous footing
4 choice options
100. An ordinary scaffolding consist of
All of the Above
4 choice options