Account Notes 301 To 400
Created on 7th June 2025
11 plays
100 Questions
No Description
Questions (100)
1. System of Green Card/ OK cards shall be followed for works costing more than
3 Crores
4 choice options
2. Which contract the detailed measurements are not required to be recorded
C
4 choice options
3. Publication of tender notice and office pick up the correct pair 1) up to 50 lakh....... District Information Officer 2) 2)15 to 25 lakh......... assistant director of publicity and information 3) 25 Lakh to 1 crore.......... Deputy Director of publicity and information 4) 1 crore and above........ Director of Information and publicity (advertisement) Mantralaya Mumbai
Only 1
4 choice options
4. As per PWD GR dated 15 /05/ 2007 cost of blank tender form for 1250 Lakhs will be
Rs. 25000
4 choice options
5. As per PWD GR 02 Nov 2006 period of calling tender for first call and second call for
15 and 8 Days
4 choice options
6. As per GR dated 21 Feb 2015 and 15 may 2015 treating special case for Jal yukt Shivar works the tender notice period reduced to...... , ........ , ........ Days for 1st 2nd & 3rd call respectively for work costing 5 Lakh to 50 Lakhs
7,5,3
4 choice options
7. Pick up the incorrect statement (clause 208 MPW)
Explanation can be demanded of the cause of Rejection of offer by any person submitting the tender
4 choice options
8. Pick up the incorrect statement
Labour co-operative society should bring solvency certificate
4 choice options
9. As per MPW manual in general lapse of sanction to administrative approval to a work or a technical sanction to an estimate for such a work will ordinarily cease to operate unless specific provisions made after a period of
5 Year
4 choice options
10. Private money can be utilise for government work in each of the following circumstances
Private money cannot be utilized
4 choice options
11. Percentage check on hidden measurements of work by DE/AE-1/AEE is
100 %
4 choice options
12. The program of works should be so arranged as to bring them to a safe stage before which season
Monsoon
4 choice options
13. All interruptions of large works in progress should be immediately reported to
Superintending Engineer
4 choice options
14. Religious Edifice can be destroyed or injured in execution on works when
Any of the above
4 choice options
15. For carrying out Public Work Departmentally or through agency of contractors
Local labour Shall be as far as possible utilized for unskilled works
4 choice options
16. Pick up the correct statement 1) Extra items not in power of EE can executed from contractor by oral orders of superintending engineer 2) Extra items can be executed in anticipation of sanction of competent authority
Both are Incorrect
4 choice options
17. Divisional accountant shall check purposal of extra item 1) the rates of extra items 2) Extra Item to be executed is within original scope of work
Both are correct
4 choice options
18. Compensation to contractor as per clause 2 of B1 and B2 tender the final authority is
Superintending Engineer
4 choice options
19. Superintending Engineer can revise his own decision for levying compensation on contractors if any new relevant facts are brought to light which might have not taken into accounts when original decision was taken
True
4 choice options
20. Class 30 of B1 and B2 agreements states that the following officer decision in certain matters relating to contractors would be final
Superintending Engineer
4 choice options
21. When permitted period Tender including extension already approved is over how many bills can Executive Engineer pay to agency/ contractors
1
4 choice options
22. Assistant executive engineer as following powers to go access our estimate sanctioned
No Powers
4 choice options
23. Power to direct the provision of contingency in the estimates for the work to new items not provided for in the estimate for superintending engineer and Executive Engineer respectively is
Full power 50,000/ Item
4 choice options
24. Power for calling for tenders from selected contractors after Reasons there of on recall to CE & SE is
25 Lakhs, 10 Lakh
4 choice options
25. Power to accept tenders over 30 crores are given to
None of the above
4 choice options
26. Who will accept tender finally for the work of 45 Lakhs and 4% above tender quoted
Executive Engineer at his own power
4 choice options
27. Power given to you for accepting tender is
5 lakh or 2 lakh
4 choice options
28. Government joint secretary is as
Chief engineer
4 choice options
29. For the works of Investigation that a preliminary for measure and medium project the cost shall be under.......... % of estimated project cost empowering officer is chief engineer
1%
4 choice options
30. Power to Accord technical sanction should be considerate being exclusive of
Centage charges
4 choice options
31. Power to Accord technical sanction to estimates by superintending engineer when these are according to approved type plans provided the general layout is accepted by government architect and chief Engineer at the time of Administrative approval
No Limits
4 choice options
32. Power to Accord technical sanction for ordinary repairs of civil work to AEE and AE- 1 when there is no budget allotment for sub division is
No Powers
4 choice options
33. Power to Accord technical sanction for civil work (original) assistant executive engineer & assistant engineer grade -1 are
(2,50,000), (1,00,000)
4 choice options
34. Power to Accord technical sanction to work of special repair of civil work having budget allotment for division for Executive Engineer......
20 Lakh per Case
4 choice options
35. Power to do survey report of building or temporary Shedes due to old age or other natural reason collapse of them is given to
Superintending Engineer
4 choice options
36. Responsibility of checking final measurements of work done under contract by Executive Engineer is........... at least
5 %
4 choice options
37. Statement - 1) government residence quarters can be allotted to private personal 2) concern administration officer should certify that the government residence quarters are not needed by the other government divisions office
1 is correct and 2 is correct reason for 1
4 choice options
38. Pick up the correct minimum preservation period for agreements with contractor
30 yrs
4 choice options
39. Pick up the correct minimum preservation period for account general inspection notes
3 yrs
4 choice options
40. Pick up the correct minimum preservation period for uplication for leave by gazetted officer
2 yrs
4 choice options
41. Which clause of B1 tender is not an Arbitration clause
30
4 choice options
42. Pick up the correct minimum preservation period for bills correspondence with subdivisional officer
10 yrs
4 choice options
43. Which authorities the losses of store should be reported by Executive Engineer
Police
4 choice options
44. Which form of agreement is to be used for departmental execution of work
A1
4 choice options
45. Which form of agreement is executed by lump sum contract
C
4 choice options
46. Which symbol is used for weekly paid holiday of daily wages labour
WPH
4 choice options
47. What is the initial record upon which the account of works are based (any one)
MB
4 choice options
48. Which is the competent authority the appoint divisional accountant
AG
4 choice options
49. Which clause of B1 tender is operated for withdrawal of work from the contractor
3
4 choice options
50. In which form the survey report is prepared and submitted to the Division Office
32
4 choice options
51. Which form of agreement is used for supply of material
D
4 choice options
52. Who will help the secretary in exercising effective control over Maintenance of Govt. accounts
IFA
4 choice options
53. When the full and free consent of the public is to be obtained in destruction of structure
Religious Edifice
4 choice options
54. Who will accept the draft tender papers for the works costing more than 60 lakhs to 1 crore
SE
4 choice options
55. What powers are deleted to EE for sanctioning the extra item rate list
100000
4 choice options
56. Which is the item rate contract
B2
4 choice options
57. What is the authorised form for preparation of contractor's Bill of first and final
46
4 choice options
58. Which form is used for making the payment on Hand receipt
48
4 choice options
59. Where the expenditure of maintenance and Repairs of Road and Bridges are to be debited
3054
4 choice options
60. What is the Authorised form of running A/C Bill of the contractor
47
4 choice options
61. What is the rate of depreciation of furniture
5 %
4 choice options
62. Which form is used for execution of agreement regarding the conveyance of material
E
4 choice options
63. Where the expenditure incurred M & R to administrative building are to be classified
2059
4 choice options
64. Which part shortage awaiting adjustments are recorded in T & P Ledger
3
4 choice options
65. Which authority is entitted to conduct load testing of bridges
MERI
4 choice options
66. Where the expenditure incurred on M & R residential building are debited
2216
4 choice options
67. What powers are deligated to the Executive Engineer to sanction the imprest to the Jr. Engineer
1000
4 choice options
68. Which book the field levels are taken
Field Book
4 choice options
69. Where the expenditure incurred on M & R to Major dams are to be debited
2701
4 choice options
70. Where the sale of fruit of the trees located in the premises of section office is classified
0701
4 choice options
71. Which contract form is used for supply of Store material
D
4 choice options
72. Which form the service record in maintained of daily wages labour
Service Roll
4 choice options
73. Which clause of B1 tender is operated to issue notice to the contractor for slow progress of work
2
4 choice options
74. Which form is used for issue of material to the contractor as per schedule A of the contract
USR
4 choice options
75. Which section is applied for issuing final declaration of private land for the govt. purpose
Section 6
4 choice options
76. What power are delegated to accept the tender of civil work to the chief engineer
15 Crores
4 choice options
77. What are the power delegated to the Executive Engineer for department execution of work
5 Lakh
4 choice options
78. What are the powers of recording the measurements to the store keeper for petty purchases without checking
4000
4 choice options
79. How much supervision charges are levied when the material are sold a local bodies
10 %
4 choice options
80. What are the Authorised forms of bills ?
All
4 choice options
81. Which class of B1 contract are to be applied in respect of Leavy of compensation for delay in execution of work ?
Clause 2
4 choice options
82. Tendering limit for class 3 contractor
3 Cr.
4 choice options
83. Initial records upon which the account of works are based
All
4 choice options
84. For T.A. Bills of class 1 & class 2 form No......... are used
MTR 18
4 choice options
85. Security advance from contractor is obtained in form No,
PWD 450
4 choice options
86. As per MPW manual Executive Engineer are authorised to sanction Execution of extra items and the rates to be paid when tender is accepted by him only and not by higher authorities or even sub ordinates. 1) Amount of an individual extra item does not exceed 10000 Rs 2) total cost of extra items is within amount up to which EE is himself competent to accept the tender 3) when extra item is comparable with similar item Already included in accepted tender provided that Schedules of rate of division does not Exceed. 4) The extra cost of extra item is Already Covered by Saving effected or clearly anticipated on other items (including contingencies)
All the correct Combinely
4 choice options
87. In case the contractor who is habitual bad workers and create obstruction/ delay in execution of works allotted to them then 1) AEE / AE-1 as a responsible officer shall convey in Written to Executive Engineer to take adverse remarks in confidential reports of contractors 2) when performance of contractor on a certain work is found to be poor then it should be intimated by Executive Engineer to the registering authority for taking it into account
Both are correct
4 choice options
88. The tender if beyond the power of acceptance of officer inviting them then 1) the tender is accepted if it is lowest 2) it should be forwarded to higher officer with necessary recommendations
1 is Incorrect & 2 is Correct
4 choice options
89. Read statements carefully 1) For all works AEE / AE-1 should himself record measurements of important items such as foundation of structure 2) whenever it is not possible to record measurements directly without the help of field book, check measurements recorded in field book in inclon the site of work should be taken as sufficient as these form original and initial record
Both Are correct
4 choice options
90. Pick up the incorrect pair Estimate amount or work pur to Tender... Security Deposit A) Up to Rs. 1 Cr...... 5 % B) Above Rs. 1 Cr..... 4% Subjected to but less than 3.00 Cr. Minimum of 5 Lakh C) Above Rs. 3.00 Cr. .... 3 % Subject to Minimum of Rs. 12 Lakh
None of the Above
4 choice options
91. Splitting of works for tender purpose is allowed to 1) maintenance and repair work 2) original work covered in one technical sanction 3 ) original work having non availability of lands 4) Any work to achieve the technical sanction & tender inviting power
Only 3
4 choice options
92. Indian Government account and Audit (chapter 1) [ open book ] : pick up the correct statements for offices of the accountants General (Account & Entitlement responsible for 1) payment and accounting functions under the departmentalised accounting set-up in respect of officers and staff of Indian Audit and Account Department. 3 ) Authorisation of income tax to gazetted employee 4 ) Authorisation of Excess income to employees in case of Agriculture Income more than 5000.
1,2
4 choice options
93. Indian Government accounts and Audit (Chapter 11) [open book] The function entrusted to the treasury are broadly 1) receipt of money from the public and departmental officers for credit to government. 2 ) payment of Claims against government on bills presented by DDO
1 & 2 Both are Correct
4 choice options
94. Indian Government Accounts and Audit (chapter 13) [open book] transfer entries are prepared to transfer an item from one head of account to another in order to 1) correct an error of classification in the original account 2) adjust by debit or credit or its proper head an item outstanding under dept, deposit or remittance head 3 ) adjust inter - departmental or other transactions which do not involve the receipt or payments of cash 4 )classify & adjust item Pertaining to more than one head when the transaction, due to administrative convenience were initially accounted for under a single head of account
All of the Above
4 choice options
95. Indian government Accounts and Audit (chapter 17) [open book] while conducting review of a project it is necessary to understand the nature of the project right from the stage it is conceived. it is therefore seen during the preliminary study : 1 ) Whether adequate surveys have been made before launching the project. 2) whether proper feasibility report were Prepared 3) Whether there is a Detailed project report and if there are deviations why these deviations have taken place. 4 ) what contracting system have been laid down.
All of the Above
4 choice options
96. Retrenchment can be done Except in cases..... 1) where it is result of punishment infected by way of disciplinary action. 2) where the termination of service is due to continuous ill health. 3) where the workmen voluntary retires. 4 ) Discharge on account of approved inefficiency
1,2,3
4 choice options
97. Pick up the correct minimum preservation period of award statements
Permentent
4 choice options
98. Pick up the correct minimum preservation period for cash book, sub -divisional and divisional
20 yrs
4 choice options
99. Pick up the correct minimum preservation period for correspondence sanctioning Tenders of work extension of time etc
30 yrs
4 choice options
100. Pick up the correct minimum preservation period for field book of measurement of irrigates area
10 yrs
4 choice options