1. The edge of the board on which T-square is made to slide is called it's.......

Working edge

4 choice options

2. The T-Square are used for drawing ........lines

Horizontal

4 choice options

3. To Draw or measure angles.......is used

Protractor

4 choice options

4. For Drawing large size Circles,.......is attached to the compass

Lengthen bar

4 choice options

5. Measurement from the scale to the Drwaing are transformed with the help of........

Divider

4 choice options

6. ........is used for setting off short equal Distance

Bow Divider

4 choice options

7. For Drawing thin lines of uniform thickness the pencil should be Sharpened in the form of......

Chisel edge

4 choice options

8. ........are used for drawing curves which can not be Drawn by a compass

French Curves

4 choice options

9. To remove unnecessary lines Drawn by pencil .......is used

Eraser

4 choice options

10. Uses of T-Square, set Squares, Scale and protector are Combined in the

Drafting machine

4 choice options

11. Set-Squares are used for Drawing.......Lines

All of these

4 choice options

12. The Size of the title block for all sizes of drawing sheet is.....

185 mm × 65 mm

4 choice options

13. The things absolutely essential for sketch work are.......

All of these

4 choice options

14. A Sketch is considered to be good when it's features are shown in correct......

Proportion

4 choice options

15. In Abbreviation BIS, I stands for

Indian

4 choice options

16. Writing of titles, notes etc on a Drawing is called.......

Lettering

4 choice options

17. Efficiency in the art lettering is achieved by Continuous......

Practice

4 choice options

18. All letters should be uniform in.......

All of these

4 choice options

19. The Size of the letter is described by it's........

Height

4 choice options

20. Lettering is Generally / Usually done In.......letters

Capital

4 choice options

21. As far as possible dimensions should be given in one unit, preferably in.......

Millimeter

4 choice options

22. An.....should never be used as Dimension line

Centre line & outline

4 choice options

23. All dimensions are shown from a common base line in.......dimensioning

Progressive

4 choice options

24. The line Connecting a view to a note is called........

Leader

4 choice options

25. The section Lines are Continuous........Lines

Thin

4 choice options

26. When 1 cm long line in a Drwaing represents 1 meter length of the object, then R.F. is equal to.....

1 / 100

4 choice options

27. Drawings of building are Drawn using..........scale

Reducing

4 choice options

28. When the drawing is drawn of the same size as that of the object, the scale used is .......

Full size scale

4 choice options

29. The scale of Chords is used to set out or measure......

Angles

4 choice options

30. The scales can be expressed as......

All of these

4 choice options

31. In......projection, the projections are perpendicular to the plane of projection.

Orthographic

4 choice options

32. In the first angle projection method, the.......... comes between the observer and the plane

object

4 choice options

33. In the third angle method, the....... comes between object and observer

Plane

4 choice options

34. The abbreviation FP Represents.......

Frontal plane

4 choice options

35. In engineering drawing methods of projection commonly used....... projection.

All of these

4 choice options

36. When the Planes of projection are extended beyond the line of intersection, they from...... Quadrants

Four

4 choice options

37. The method of Drawing perspective view is........

Visual ray method & vanishing point method

4 choice options

38. To represent a solid on a flat surface having only length and breadth, at least........ views are necessary

Two orthographic

4 choice options

39. The projection of a solid on the plane to which its axis is perpendicular, will show the.......... shape and size of its base.

True

4 choice options

40. In engineering drawing what is H.P and V.P ?

Horizontal plane and vertical plane

4 choice options

41. The type of scale used in drawing is........

Natural scale and logarithmic scale

4 choice options

42. Estimate the quantity of Brickwork required in a wall 4 m long, 3 m high and 30 cm thick in m3

3.6 m

4 choice options

43. Estimate the quantity of plastering recovered in a wall 4 m long 3 M high and 30 cm thick

24 m2

4 choice options

44. Reason for exceeding the estimate is........

All of these

4 choice options

45. The primary object of the estimate is to enable one to know before hand.......

The cost of work

4 choice options

46. Sloping roof may be of.........

All of these

4 choice options

47. G.C.I sheets are sold by........

Weight

4 choice options

48. A.C sheets are sold in.......

M2

4 choice options

49. In absense of detailed design, the % of steel for RCC beam maybe taken as.........% of concrete

1 To 2

4 choice options

50. In Abbreviation DPC,P stands for.....

Proof

4 choice options

51. The methods of building estimate are.......

Both 1 and 2

4 choice options

52. In case of line plan of building, the dimension of internal measurement of the rooms are usually given in.....

Plan

4 choice options

53. Plinth area rate includes the cost of......

All of these

4 choice options

54. AN estimate is the probable cost of a work and is usually prepared........... the construction of work

Before

4 choice options

55. For the preparation of estimate necessary data required is........

All of these

4 choice options

56. Provision for contingencies......... of the estimate cost is made in the estimate

3% to 5%

4 choice options

57. Provision for W/C establisment is made at............% of the estimated cost.

2%

4 choice options

58. When the expenditure on a work exceed the amount of Administrative approval by more than...........% received estimate is required to be prepared

10 %

4 choice options

59. Detailed estimate is prepared for......... of the competent authority for arranging contract and execution of work.

Technical sanction

4 choice options

60. Site plan of a building shows......

All of these

4 choice options

61. The analysis of rate for a particular item of a work includes

All of these

4 choice options

62. The capacity of doing work by skilled labour in the form of quantity of work per day is known as.......

Task

4 choice options

63. Give the task work per mason per day for CC 1:2:4

5 m3

4 choice options

64. Give the task work per mason per day for excavation of ordinary soil......m3

3

4 choice options

65. The quantity of bricks in numbers required for 1m cube of brick work (take nominal size to brick)

500

4 choice options

66. Quantity of paint (Stiff) required for painting one coat for 100 square feet is........ kg

1.0

4 choice options

67. The number of cement bags required for 1m cube C.C. 1:2:4 is..... bages

6.60

4 choice options

68. For practical purpose, 1 m cube of Portland cement includes............ bags

30

4 choice options

69. 1 bag of cement =.......... Cum.

0.034

4 choice options

70. The density of steel is........kg/m3

7850

4 choice options

71. ........ from important parts of contract document.

Drawings and specifications

4 choice options

72. As per the detailed specifications of earth work in excavation in foundation the excavated earth shall not be placed within.......... metre of the edge of the trench

1.0

4 choice options

73. The rate of excavation for foundation Trench......... the cost of De- watering the accumulated water in the trench

Includes

4 choice options

74. For a first class building work, the superstructure shall be of first class brick work with.......... cement motor.

1 : 6

4 choice options

75. According to the specifications of a third class building, flooring Shall be of brick......... floor over well rammed Earth

On edge

4 choice options

76. Minimum compressive strength of concrete 1: 2: 4 proportion shall be.......kg/cm2 on 7 days

140

4 choice options

77. A Slump of........ may be allowed for building work.

7.5 to 10 cm

4 choice options

78. Concrete shall be laid gently in layers not exceeding.......cms and compacted by rods

15

4 choice options

79. Ine RCC work, for the joint of bar on overlap of....... times diameter of the bar shall be given.

40

4 choice options

80. For the first class brick work, brick shall have a minimum crushing strength of.........kg/cm2

105

4 choice options

81. Brick shall be fully soaked in clean water by submerging in a tank for a period of....... hours immediately before use.

12

4 choice options

82. Brick work shall be carried out not more than........ metre height at a time

1.0

4 choice options

83. The brick work shall be kept wet for a period of at least......... days after laying

10

4 choice options

84. Earthwork Shall by measured in.......

M3

4 choice options

85. Form work, centering and shuttering shall be measured under separate item in.........

Sq. M

4 choice options

86. What is the task work per day for pointing of brick work ?

10 m2

4 choice options

87. Safe Permissible load in tons/m2 for M -15 grade of concrete is......

330

4 choice options

88. 1 bag of Portland cement weight........kg

50

4 choice options

89. Number of cement bags required for 1m3 of PCC 1:2:4 is......

6.25

4 choice options

90. The number of bricks required for 1m3 B.B Masonry in cement mortar 1:6 is......

500 nos

4 choice options

91. Reduction in the strength of cement after one year storage is......

40 %

4 choice options

92. What is the superimposed live load for RCC slab of residential building ?

200 kg /cm2

4 choice options

93. The strength of OPC cement concrete after 28 days will be.........%

100

4 choice options

94. One cubic metre is equivalent to.......... cubic feet.

10.76

4 choice options

95. 1 kilo litre = .......litre.

1000

4 choice options

96. If the scale of drawing of plan for a building is 1 cm = 2 m what is will be the R.F ?

1/200

4 choice options

97. The normal height of a floor for residential building is.......

3.0 m

4 choice options

98. M-20 grade concrete coincides with......

1 : 1/2 : 3

4 choice options

99. One bag of cement weighing 50 k.g. equals by volume is.......litres

35

4 choice options

100. Quantity of water required for mixing 1:2:4 concrete when water cement ratio is 0.50 ...........litres

25

4 choice options