1. The edge of the board on which T-square is made to slide is called it's.......
Working edge
4 choice options
2. The T-Square are used for drawing ........lines
Horizontal
4 choice options
3. To Draw or measure angles.......is used
Protractor
4 choice options
4. For Drawing large size Circles,.......is attached to the compass
Lengthen bar
4 choice options
5. Measurement from the scale to the Drwaing are transformed with the help of........
Divider
4 choice options
6. ........is used for setting off short equal Distance
Bow Divider
4 choice options
7. For Drawing thin lines of uniform thickness the pencil should be Sharpened in the form of......
Chisel edge
4 choice options
8. ........are used for drawing curves which can not be Drawn by a compass
French Curves
4 choice options
9. To remove unnecessary lines Drawn by pencil .......is used
Eraser
4 choice options
10. Uses of T-Square, set Squares, Scale and protector are Combined in the
Drafting machine
4 choice options
11. Set-Squares are used for Drawing.......Lines
All of these
4 choice options
12. The Size of the title block for all sizes of drawing sheet is.....
185 mm × 65 mm
4 choice options
13. The things absolutely essential for sketch work are.......
All of these
4 choice options
14. A Sketch is considered to be good when it's features are shown in correct......
Proportion
4 choice options
15. In Abbreviation BIS, I stands for
Indian
4 choice options
16. Writing of titles, notes etc on a Drawing is called.......
Lettering
4 choice options
17. Efficiency in the art lettering is achieved by Continuous......
Practice
4 choice options
18. All letters should be uniform in.......
All of these
4 choice options
19. The Size of the letter is described by it's........
Height
4 choice options
20. Lettering is Generally / Usually done In.......letters
Capital
4 choice options
21. As far as possible dimensions should be given in one unit, preferably in.......
Millimeter
4 choice options
22. An.....should never be used as Dimension line
Centre line & outline
4 choice options
23. All dimensions are shown from a common base line in.......dimensioning
Progressive
4 choice options
24. The line Connecting a view to a note is called........
Leader
4 choice options
25. The section Lines are Continuous........Lines
Thin
4 choice options
26. When 1 cm long line in a Drwaing represents 1 meter length of the object, then R.F. is equal to.....
1 / 100
4 choice options
27. Drawings of building are Drawn using..........scale
Reducing
4 choice options
28. When the drawing is drawn of the same size as that of the object, the scale used is .......
Full size scale
4 choice options
29. The scale of Chords is used to set out or measure......
Angles
4 choice options
30. The scales can be expressed as......
All of these
4 choice options
31. In......projection, the projections are perpendicular to the plane of projection.
Orthographic
4 choice options
32. In the first angle projection method, the.......... comes between the observer and the plane
object
4 choice options
33. In the third angle method, the....... comes between object and observer
Plane
4 choice options
34. The abbreviation FP Represents.......
Frontal plane
4 choice options
35. In engineering drawing methods of projection commonly used....... projection.
All of these
4 choice options
36. When the Planes of projection are extended beyond the line of intersection, they from...... Quadrants
Four
4 choice options
37. The method of Drawing perspective view is........
Visual ray method & vanishing point method
4 choice options
38. To represent a solid on a flat surface having only length and breadth, at least........ views are necessary
Two orthographic
4 choice options
39. The projection of a solid on the plane to which its axis is perpendicular, will show the.......... shape and size of its base.
True
4 choice options
40. In engineering drawing what is H.P and V.P ?
Horizontal plane and vertical plane
4 choice options
41. The type of scale used in drawing is........
Natural scale and logarithmic scale
4 choice options
42. Estimate the quantity of Brickwork required in a wall 4 m long, 3 m high and 30 cm thick in m3
3.6 m
4 choice options
43. Estimate the quantity of plastering recovered in a wall 4 m long 3 M high and 30 cm thick
24 m2
4 choice options
44. Reason for exceeding the estimate is........
All of these
4 choice options
45. The primary object of the estimate is to enable one to know before hand.......
The cost of work
4 choice options
46. Sloping roof may be of.........
All of these
4 choice options
47. G.C.I sheets are sold by........
Weight
4 choice options
48. A.C sheets are sold in.......
M2
4 choice options
49. In absense of detailed design, the % of steel for RCC beam maybe taken as.........% of concrete
1 To 2
4 choice options
50. In Abbreviation DPC,P stands for.....
Proof
4 choice options
51. The methods of building estimate are.......
Both 1 and 2
4 choice options
52. In case of line plan of building, the dimension of internal measurement of the rooms are usually given in.....
Plan
4 choice options
53. Plinth area rate includes the cost of......
All of these
4 choice options
54. AN estimate is the probable cost of a work and is usually prepared........... the construction of work
Before
4 choice options
55. For the preparation of estimate necessary data required is........
All of these
4 choice options
56. Provision for contingencies......... of the estimate cost is made in the estimate
3% to 5%
4 choice options
57. Provision for W/C establisment is made at............% of the estimated cost.
2%
4 choice options
58. When the expenditure on a work exceed the amount of Administrative approval by more than...........% received estimate is required to be prepared
10 %
4 choice options
59. Detailed estimate is prepared for......... of the competent authority for arranging contract and execution of work.
Technical sanction
4 choice options
60. Site plan of a building shows......
All of these
4 choice options
61. The analysis of rate for a particular item of a work includes
All of these
4 choice options
62. The capacity of doing work by skilled labour in the form of quantity of work per day is known as.......
Task
4 choice options
63. Give the task work per mason per day for CC 1:2:4
5 m3
4 choice options
64. Give the task work per mason per day for excavation of ordinary soil......m3
3
4 choice options
65. The quantity of bricks in numbers required for 1m cube of brick work (take nominal size to brick)
500
4 choice options
66. Quantity of paint (Stiff) required for painting one coat for 100 square feet is........ kg
1.0
4 choice options
67. The number of cement bags required for 1m cube C.C. 1:2:4 is..... bages
6.60
4 choice options
68. For practical purpose, 1 m cube of Portland cement includes............ bags
30
4 choice options
69. 1 bag of cement =.......... Cum.
0.034
4 choice options
70. The density of steel is........kg/m3
7850
4 choice options
71. ........ from important parts of contract document.
Drawings and specifications
4 choice options
72. As per the detailed specifications of earth work in excavation in foundation the excavated earth shall not be placed within.......... metre of the edge of the trench
1.0
4 choice options
73. The rate of excavation for foundation Trench......... the cost of De- watering the accumulated water in the trench
Includes
4 choice options
74. For a first class building work, the superstructure shall be of first class brick work with.......... cement motor.
1 : 6
4 choice options
75. According to the specifications of a third class building, flooring Shall be of brick......... floor over well rammed Earth
On edge
4 choice options
76. Minimum compressive strength of concrete 1: 2: 4 proportion shall be.......kg/cm2 on 7 days
140
4 choice options
77. A Slump of........ may be allowed for building work.
7.5 to 10 cm
4 choice options
78. Concrete shall be laid gently in layers not exceeding.......cms and compacted by rods
15
4 choice options
79. Ine RCC work, for the joint of bar on overlap of....... times diameter of the bar shall be given.
40
4 choice options
80. For the first class brick work, brick shall have a minimum crushing strength of.........kg/cm2
105
4 choice options
81. Brick shall be fully soaked in clean water by submerging in a tank for a period of....... hours immediately before use.
12
4 choice options
82. Brick work shall be carried out not more than........ metre height at a time
1.0
4 choice options
83. The brick work shall be kept wet for a period of at least......... days after laying
10
4 choice options
84. Earthwork Shall by measured in.......
M3
4 choice options
85. Form work, centering and shuttering shall be measured under separate item in.........
Sq. M
4 choice options
86. What is the task work per day for pointing of brick work ?
10 m2
4 choice options
87. Safe Permissible load in tons/m2 for M -15 grade of concrete is......
330
4 choice options
88. 1 bag of Portland cement weight........kg
50
4 choice options
89. Number of cement bags required for 1m3 of PCC 1:2:4 is......
6.25
4 choice options
90. The number of bricks required for 1m3 B.B Masonry in cement mortar 1:6 is......
500 nos
4 choice options
91. Reduction in the strength of cement after one year storage is......
40 %
4 choice options
92. What is the superimposed live load for RCC slab of residential building ?
200 kg /cm2
4 choice options
93. The strength of OPC cement concrete after 28 days will be.........%
100
4 choice options
94. One cubic metre is equivalent to.......... cubic feet.
10.76
4 choice options
95. 1 kilo litre = .......litre.
1000
4 choice options
96. If the scale of drawing of plan for a building is 1 cm = 2 m what is will be the R.F ?
1/200
4 choice options
97. The normal height of a floor for residential building is.......
3.0 m
4 choice options
98. M-20 grade concrete coincides with......
1 : 1/2 : 3
4 choice options
99. One bag of cement weighing 50 k.g. equals by volume is.......litres
35
4 choice options
100. Quantity of water required for mixing 1:2:4 concrete when water cement ratio is 0.50 ...........litres
25
4 choice options