1. As per IRC recommendation for CBR method of design Lane distribution factor for two Lane single carriageway road is
0.75
4 choice options
2. As per IRC recommendation for CBR method of design traffic growth rate maybe considered as......... if data not available
7.50 %
4 choice options
3. As per IRC recommendations, per day number of........... is considered for pavement design by CBR method.
Commercial vehicles of gross weight 3 tonne or more
4 choice options
4. The CBR method of pavement design gives
Total thickness requirement of the Pavement above subgrade
4 choice options
5. The design CBR for payment design shall be
4 day soaked CBR of remoulded sample
4 choice options
6. Which of the following pavement composition is recommended if total pavement thickness required is 575 mm for a CBR say 5% ?
25 mm SDBC +50 mm BM +225 WBM + 275 GSB
4 choice options
7. Which of the following is an example of flexible pavement?
Bituminous pavement
4 choice options
8. What is the true for Dowel bars in cc pavement ?
Half length is bonded in CC slab and remaining is embedded in adjacent slab
4 choice options
9. In CC pavement tie bars are provided......
Across the longitudinal joints of two adjacent slabs
4 choice options
10. For compaction of non plastic silts and fine Sands......... are used.
Pneumatic tyred roller
4 choice options
11. In construction of WBM roads rolling
starts from either edge and gradually shifts towards centre
4 choice options
12. In construction of WBM roads rolling
Is done after spreading course aggregates and also after application of binding material and water
4 choice options
13. In construction of WBM roads, lateral confinement in form of shoulder.......
Is provided before coarse aggregates are spread
4 choice options
14. Soil stabilization is done to
Improve the stability or bearing power of the soil
4 choice options
15. Before filling pot holes are.......
Cut to rectangular shape and affected material is removed
4 choice options
16. The first priority of road maintenance is.......
To fill potholes
4 choice options
17. The finished level of pot hole filling is kept.....
Slightly Above original level to allow further compaction under traffic
4 choice options
18. For a bitumen hungry surface of road,
Liquid seal Coat is provided
4 choice options
19. The test validity of the statement "for wbm roads, it is necessary to replace the soil Binder periodically"
True ,it is required as rains wash out binding material and aggregates protrude out
4 choice options
20. Benkelman beam method is used
To design thickness overlay over a flexible pavement
4 choice options
21. Catch water Drains are provided.....
To intercept and divert the water from the hill slope
4 choice options
22. Drainage of rain water is important for roads....
In all types of terrains
4 choice options
23. Job mix design refers to...
Proportioning of aggregates and deciding bitumen content required
4 choice options
24. Crush metal of 25 mm size shall pass 100% through.......... square mesh and 100% Retain on........ square mesh
40mm, 20mm
4 choice options
25. Riding return is cast Monolithic with......
Solid abutment
4 choice options
26. Raft foundation for Bridge is suitable where...
Hard Strata is not available at economical depth
4 choice options
27. A bridge which never gets overtopped during floods is
High level Bridge
4 choice options
28. For solid slab Bridge upto span of 10 m,......... is used
Tar paper bearing
4 choice options
29. For submersible Bridges, following type of parapet is NOT suitable
RCC anti crash barrier
4 choice options
30. For Bridge with Rawat Foundation, flexible media consist of
900 mm thick sand filling
4 choice options
31. Length of raft slab is kept equal to......
Distance between the heels of abutment right and abutment left
4 choice options
32. Clear carriageway with of single Lane Bridge is
4.25 m
4 choice options
33. RCC wearing course is provided on deck of......
Submersible bridges
4 choice options
34. For bridge of height 8 m with hard Strata at Shallow depth which type of Return is used ?
Soild retaining walls
4 choice options
35. And is filled in box return because
It can be compacted by hand compaction as roller compaction in box return is not possible
4 choice options
36. Which of the following is NOT provided for submersible bridges
Water spouts
4 choice options
37. The foundation of pier/ abutment of bridge shall be keyed into the hard rock by
0.6 m
4 choice options
38. In inglis formula for calculation of discharge if C =7000 and A is catchment area in sq. Mile discharge is given in
Cusec
4 choice options
39. O.H.F.L in Bridge engineering stand for
Observed highest flood level
4 choice options
40. Soffit of submersible river bridge is calculated as Soffit level =
OFL + Afflux + Vertical Clearance in m.
4 choice options
41. % obstruction for bridges is Calculated on ......
Obstructed discharge Basis
4 choice options
42. Expansion joint used for solid slab Bridge with span upto 10 m, is
Pre Moulded Bituminous Pad
4 choice options
43. In Raft foundation, apron and apron wall are provided.
After casting of cut off walls but before casting raft slab
4 choice options
44. Weep Holes are provided
In abutments and Returns
4 choice options
45. In a normal slab Girder Bridge main rainforcement in the slab is provided along the......
Traffic Direction
4 choice options
46. The weight of stone to be used for apron for raft Foundation shall not be less than
40 k.g
4 choice options
47. G.A.D stands for....
General Arrangement Drawing
4 choice options
48. To calculate Scour level,......... is used
Silt Factor
4 choice options
49. As per IRC, in moderate condition concrete cover to reinforcement in pier is
40 mm
4 choice options
50. In skew river bridge, piers are oriented
Along the current Direction
4 choice options
51. The minimum vertical clearance required in the verhicular underpass with light traffic is
3.5 m
4 choice options
52. The economical span to height ratio for Bridge with open Foundation is
1.25 to 1.50
4 choice options
53. R.E. wall stands for
Reinforcement Earth wall
4 choice options
54. R.E. walls ate used for approaches of
Flyovers and ROBs
4 choice options
55. Which of the following are traffic control device ? 1. Signs. 2. Signals 3. Road marking 4. Islands
All
4 choice options
56. BBM stands for 1. Bitumen Bound Macadam 2. Burnt brick Masonry 3. Bridge Bench Mark 4. Bitumen Built Macadam
1,2
4 choice options
57. 'MSA' Stands for 1. Material at site Account 2. Maximum Size of Aggregates 3. Million Standard Axles 4. Mean Size of Aggregates
1,2,3
4 choice options
58. Which of the followings are TRUE statements ? 1. Non- Load bearing walls carry their own weight only 2. Load bearing walls carry their own weight 3. Non-Load bearing walls carry superimposed loads 4. Load bearing walls carry superimposed loads
1,2,4
4 choice options
59. The methods of soil stabilization are...... 1. mechanical soil stabilization 2. soil lime stabilization 3. soil bitumen stabilization 4. soil concrete stabilization
1,2,3
4 choice options
60. Calculate spacing of T-8 bars required to be provided for surface rainforestment of 5 kg /sq.m equally divided in both direction (rounded to lower multiply of 10)
150
4 choice options
61. Volume of wall type pier With all- round batter is calculated correctly by
Prismoidal formula = H/6 *(Atop + 4* Amid + Abot)
4 choice options
62. Which of the following statements about period of removal of formwork are true ? 1.vertical sides of slabs beams columns and walls....24-48 2. Slab soffit (with props left)........3 Days 3. Props of Slab (span upto 4.5 m ).......7 Days 4. Props of Slab (span > 4.5m ).........14 Days
All Four are True
4 choice options
63. Which of the following lists all components of the piles Foundation
Piles, pile Cap and steel liner.
4 choice options
64. Calculation volume of wall type pier with half round cut and easy water, straight length = 6.0 m, width = 1.00 m without Batter. Height = 10 m
67.85 cum
4 choice options