Survey 1 To 100 Y 17
Created on 10th August 2025
7 plays
104 Questions
No Description
Questions (104)
1. The object of Surveying is to prepare a ........
Map
4 choice options
2. The main principal of Surveying is to Work from........
The whole to the part
4 choice options
3. Surveys which deplct the natural features of a Country are known as..... Surveys
Topographical
4 choice options
4. A 20 meter chain is divided in to.......links
100
4 choice options
5. The length of Guntur's chain is.......feet
66
4 choice options
6. Chain Survey is recommended when the area is.....
Simple and fairly level
4 choice options
7. In chain Survey Area is divided into....
Triangles
4 choice options
8. The sketch prepared during Reconnaissance survey is....
Index sketch
4 choice options
9. The working principle of the optical square is based on.....
Double reflection
4 choice options
10. The field records of the chain Survey is entered in a/an
Field Book
4 choice options
11. The main Survey stations are located on the ground by....
Reference sketches
4 choice options
12. The perpendicular offsets may be taken by setting the right angle in the ratio
3:4:5
4 choice options
13. If a 20 m chain gets displaced from correct alignment by a perpendicular Distance "d" meter then the error is given by
D2/40
4 choice options
14. If a wooded area obstructs the chain line, then it is crossed by the.... line
Random
4 choice options
15. When the area is large, undulating and crowded with many details the method of....is adopted
Traversing
4 choice options
16. The size of compass is designated by its.....
Diameter
4 choice options
17. The Surveyor's compass shows the..... bearing of line
Quandrantal
4 choice options
18. In a prismatic compass, the zero is marked on the .......
South end
4 choice options
19. In surveyor's compass the ring is graduated.......
In quadrants o degree To 90 degree
4 choice options
20. Open traverse is suitable in the survey of
Rivers
4 choice options
21. The sum of interior angles of a closed traverse having 'N' side is......
(2N-4) × 90 Degree
4 choice options
22. In the WBC system a line is said to be free from local attraction, if the fore bearing and back bearing differences is....
180 degree
4 choice options
23. The accuracy of open traverse is checked by the.......
Cut off line
4 choice options
24. If the fore bearing of a line is 145 degree 30 then its back bearing will be....
325 degree 30'
4 choice options
25. In the WBC system, a line is said to be free from local attraction if the difference between the fore bearing and back bearing is......
180 degree
4 choice options
26. The accuracy of the open Travels is checked by .....
Cut off line
4 choice options
27. The closing error in a closed traverse in adjusted by.....
Bowditch rule
4 choice options
28. The method of keeping the plane table in successive stations parallel to the position it occupied at the starting station is known as.....
Orientation
4 choice options
29. The term strength of fix is related to the
Three point problem
4 choice options
30. In plane table survey the operation which must be carried out is......
Orientation
4 choice options
31. The working edge of the alidobe is known as the.....
Fiducial edge
4 choice options
32. The north line of the map is Marked on..... corner
Right hand top
4 choice options
33. The U frok and plumb bob are required for......
Centering
4 choice options
34. The principal of plane table is.....
Parallelism
4 choice options
35. The plane table map cannot be plotted to a different scale, as there is no......
Field Book
4 choice options
36. The strength of fix is bad, if the plane table station is taken....
On the circumference of the great circle
4 choice options
37. What are the methods of plane table ?
All of these
4 choice options
38. The datum adopted for India is......
MSL At Karachi
4 choice options
39. The bench mark established by the survey of India is known as
GTS
4 choice options
40. The surface of the still water is considerate to be....
Level
4 choice options
41. The surface tangential to a level surface is said to be a........ surface
Horizontal
4 choice options
42. The line of collimation and axis of the telescope should.....
Coincide
4 choice options
43. The length of sopwith Telescopic leveling staff is..... metre
4.0
4 choice options
44. When there is relative movement between the cross hairs and staff reading, it is known as.....
Parallax
4 choice options
45. The staff reading taken on a point of known elevation is termed as....... reading
Back sight
4 choice options
46. The internal focusing telescope is focused by moving the....
Double concave lens
4 choice options
47. Buy arithmetical check we can ensure the accuracy of....
Field work & Calculation
4 choice options
48. The operation of leveling to determine the elevation between two point is known as
Differential leveling
4 choice options
49. The benchmark fixed at the end of days work is called the......... B.M
Temparary
4 choice options
50. The operation of leveling from finishing point to the starting point at the end of day's work is known as......
Check leveling
4 choice options
51. The operation of leveling across any river is termed as.....Leveling
Reciprocal
4 choice options
52. The operation of leveling from any benchmark to the starting point of any project is known as.....leveling
Fly
4 choice options
53. To eliminate collimation error, the leveling instrument must be placed
Exacting midway between B.S. and F.S
4 choice options
54. The real image of the object is formed.....
In the plane of cross hairs
4 choice options
55. The Diapragm is fitted......
Infornt of the eye piece
4 choice options
56. The tangent to the longitudinal surface of the bubble tube is known as the.....
Axis of the bubble
4 choice options
57. The sensitiveness of the bubble is directly relected to........
The radius of the curvature of bubble tube
4 choice options
58. The line joining the points of equal elevation is called......
Contour
4 choice options
59. The vertical Distance between two adjacent Contour lines is called the......
Contour interval
4 choice options
60. The line formed along, the intersection of the ground surface and a level surface is known as the.......line
Contour
4 choice options
61. A contour line intersects a Ridge line or Valley line.....
Perpendicularly
4 choice options
62. The contour interval for a particular map is.......
Kept constant
4 choice options
63. When contour line touch one another at a particular zone it indicates.......
Vertical cliff
4 choice options
64. When lower values are inside the loop it indicates........
A depression
4 choice options
65. When the higher values are inside the loop it indicates a.....
Hill
4 choice options
66. The contour interval is inversely proportional to......
Steepness of the area
4 choice options
67. When a contour interval is fixed between 0.25 and 0.50 m it indicates....
A Flattish Slope
4 choice options
68. The alignment of highways are generally taken along the......
Ridge line
4 choice options
69. When contours of different elevation cross each other It indicates a/an
Overhanging cliff
4 choice options
70. The horizontal distance between two consecutive contours is called is......
Horizontal equivalent
4 choice options
71. When consecutive contour line runs close together it indicates a.....
Steep slope
4 choice options
72. A Simpson's formula, the number of ordinates must be....
Odd
4 choice options
73. In the trapezoided formula, the number of division should be.....
Either odd or even
4 choice options
74. Irregular area may be computed by an instrument known as the.......
Planimeter
4 choice options
75. When the tracing point is moved along a circle without rotatin of the wheel, then the circle is known as......
Zero circle
4 choice options
76. When the anchor point is inside the figure the area of zero circle is.....
Added
4 choice options
77. The value of the planimetre constaut (C) is added only when the anchor point is...... the figure
Inside
4 choice options
78. The volume completed by the prismoidal method is considered to be......
Exact
4 choice options
79. To obtain the correct volume using trapezoidal rule, the prismoidal correction should always be.....
Substracted
4 choice options
80. The horizontal distance through the excavated earth transported from the barrow area to the site of work is called as.....
Lead
4 choice options
81. The vertical distance through which excavated Earth is lifted is known as......
Lift
4 choice options
82. The graph prepared in order to facilated proper distribution of excavated earth is known as.....
Mass diagram
4 choice options
83. A Theodolite in which the telescope can be revolved through a complete revolution in a vertical plane is known as.....
Transit theodolite
4 choice options
84. The size of the Theodolite is defined according to......
Diameter of graduated horizontal circle
4 choice options
85. Face left position is also called.......
Telescope normal
4 choice options
86. In case of the theodolite if 'D' is the smallest value of main scale and 'v' the smallest value of vernier scale then the least count of the vernier is given by.......
d-v
4 choice options
87. In a closed traverse, the algebraic sum of latitude and departure must be equal to.....
0 degree
4 choice options
88. Lines AB and BC intersect at 'B' and the angle B is measured by theodolite, then the deflection angle of line BC is given by.....
180 degree - angle B
4 choice options
89. Fine adjustment in theodolite is done by
Tangent screw
4 choice options
90. The included angles of the traverse are measured....
Clockwise
4 choice options
91. Balancing of traverse is done according to the.....
Transit rule
4 choice options
92. The differenct types of vertical curves are......
Summit Curve & sag Curve
4 choice options
93. A transit theodolite fitted with a stadia diaphragm and analytic lense is known as a/an
Tachometer
4 choice options
94. An analytic lense is provided to make a additive constant equal to....
0
4 choice options
95. In tangential techeometry the staff is held....
Vertically
4 choice options
96. A building is set out in order to clearly define the......
All of these
4 choice options
97. What is the permissible error in chaining for precise work ?
1 in 2000
4 choice options
98. What is the angle between the mirror of optical square ?
45 degree
4 choice options
99. What types of telescope do you know of ?
The external focussing telescope & the internal focussing telescope
4 choice options
100. In surveying the measurements are taken only in the....... plane
Horizontal
4 choice options
101. Reconnaissance survey is done for...
Feasibility of project and rough cost
4 choice options
102. 10 decimeter (dm)
1 m
4 choice options
103. 90 degree equal to
II/2
4 choice options
104. 100 hectares (ha) equal to
1 km2
4 choice options